New Construction Stages and the Inspections to Book

City inspectors check that a house meets code. A private inspector checks the quality of the work, and the best time is before the walls close up. Enter your contract date to see when each stage and inspection is likely to land.

Loading the tool…

During the build

  • Ask who your construction manager is and how they share updates.
  • Confirm in writing that you may bring a private inspector.
  • Visit only with permission and in closed-toe shoes.
  • Keep your job, credit and savings steady for the final loan check.
  • Start insurance quotes about 60 days before closing.

Florida check

Hurricane season. June through November storms can pause work and push dates. Check how your contract treats weather delays.

Certificate of occupancy. You cannot close until the city or county issues it after the final inspections.

The inspections that matter

Pre-pour (optional)

Checks forms, steel and plumbing before the slab is poured. Hard to fix anything later.

Pre-drywall (most important)

Framing, roof connections, wiring, plumbing and ducts while they are still visible.

Final and blue-tape walk

A full inspection, then a walk with the builder to tape every item to fix.

11-month warranty walk

Catch settling and system problems before the first-year warranty ends. Set a reminder.

Construction questions

Most to-be-built single-family homes in our communities take about 4 to 6 months from contract to closing, depending on the builder, permits and weather.

A private inspection after framing, roofing and rough plumbing, electrical and A/C are in, but before insulation and drywall cover them.

City inspections check code minimums at set points. A private inspector looks for workmanship problems the builder can still fix before closing.

Most builders allow scheduled visits with a staff member for safety reasons. Ask how often and how to book.

A final walk with the builder, marking every flaw with blue tape so it is fixed before or shortly after closing.

Your contract sets an estimated date and usually an outside date. Check what it says about weather, supply and permit delays, and about rate lock extensions.